In short
- An EWS1 form is a standard RICS form that tells mortgage lenders and valuers whether the external walls of a block of flats have been assessed by a suitable professional.
- It is not a fire safety certificate and it is not a legal requirement. Lenders and valuers decide when to ask for one.
- Since 1 November 2026, the RICS standard valuers follow says an EWS1 form should only be requested where there is a clear rationale.
- The form should be backed by an appraisal of the walls to PAS 9980, now the 2026 edition.
- One form covers the whole block. It is commissioned by the building owner or managing agent, not by individual flat owners.
- Block18 provides a PAS 9980 appraisal and signed EWS1 form for blocks up to 18 metres from £2,450 fixed.
What is an EWS1 form?
EWS stands for external wall system. The EWS1 form, full title External Wall Fire Review, was created in December 2019 by the Royal Institution of Chartered Surveyors (RICS) together with UK Finance and the Building Societies Association. Its purpose was simple: give mortgage lenders a consistent way to know whether the walls of a block of flats had been looked at by someone qualified, so that flats in those blocks could be valued and mortgaged again.
The current version is the third edition, issued on 16 March 2022. It is completed and signed electronically and carries version control, so there is a record if a building has been assessed more than once. Forms signed on earlier editions remain valid for five years from the date they were signed.
The form itself is short. What matters is the investigation behind it. Since 2022 the form has said that the assessment of fire risk should follow PAS 9980, and that the signatory should give the building owner a separate report on their investigation to support what the form says. In practice that report is a fire risk appraisal of external walls, known as an FRAEW.
What an EWS1 form is not
This is where most confusion comes from, so it is worth being clear.
- It is not a fire safety certificate. RICS states that the form is for valuation and lending purposes only and does not replace a fire risk assessment.
- It is not a legal requirement. No law says a building of a certain height must have one. Lenders and their valuers choose whether to ask.
- It does not confirm building regulations compliance. It records the outcome of a risk appraisal, not a regulatory sign off.
- It is not for one flat. A single form covers the whole block, and every flat owner in the building can rely on the same one.
When do you need an EWS1 form?
You need one when a lender or its valuer asks for one. Whether they should ask depends on the building.
RICS published the second edition of its professional standard for valuing flats in buildings with cladding in May 2026. It came into effect on 1 November 2026. Under it, a valuer should only request an EWS1 form where there is a clear rationale. The criteria look at building height, visible cladding, curtain wall glazing and certain balcony arrangements, with separate thresholds for:
- buildings over six storeys
- buildings of five or six storeys
- buildings of four storeys or fewer
The aim is to stop forms being requested for buildings that plainly do not need them, which held up sales and remortgages for years. If a valuer asks for a form on a building that does not meet the criteria, it is reasonable to ask them to explain their rationale.
Not sure where your building stands? Send us photographs for a free eligibility check and we will tell you whether a form should be needed before you spend anything.
EWS1 ratings: A1, A2, A3, B1 and B2
The signatory completes one of two options and ticks one of five ratings. Option A is for buildings where the external wall materials are unlikely to support combustion. Option B is for buildings where combustible materials are present in the wall.
| Rating | What it means | Works needed? |
|---|---|---|
| A1 | Wall materials unlikely to support combustion, and no balconies or attachments with significant combustible material. | No |
| A2 | Attachments such as balconies include some combustible material, but a risk assessment confirms no remedial works are needed. | No |
| A3 | Neither of the above applies. There may be costs of remedial works to attachments. | Possibly, to attachments |
| B1 | Combustible materials are present in the wall, but the fire risk is low enough that no remedial works are required. | No |
| B2 | The fire risk is high enough that remedial works, and possibly interim measures, are required. | Yes |
Many lenders will lend on A1, A2 and B1. A3 and B2 often mean the lender will wait until works are done. Our guide to EWS1 ratings explains each one and what to do next.
Who can sign an EWS1 form?
The form must be signed by a suitably qualified professional with relevant expertise. RICS runs an External Wall System Assessment Training Programme, which leads to an Ofqual Level 6 qualification. RICS says successful completers should be capable of completing an FRAEW and Option A or Option B of the form for buildings below 18 metres, provided they assess their own competence and consult a fire engineer on very complex or high risk buildings.
For higher risk buildings, those of 18 metres or seven storeys and above, the assessment is expected to be carried out by an incorporated or chartered engineer registered through the Institution of Fire Engineers, or another body that can demonstrate fire engineering competence.
Lenders check who has signed. In 2025 UK Finance and the Building Societies Association updated their industry statements to address forms more than five years old and forms signed by an invalid signatory. Before you appoint anyone, ask about their qualifications, experience with similar buildings and professional indemnity insurance that covers EWS1 work.
Who commissions and pays for an EWS1 form?
Because the form covers the whole building, it is commissioned by the building owner, the freeholder, the residents management company or a managing agent acting for them. An individual flat owner cannot normally commission one, because the assessment needs access to the whole building, sometimes involves small openings in the walls, and is issued to the owner.
How the cost is recovered depends on the leases. In many blocks it is recovered through the service charge. If you are a leaseholder whose sale has stalled, the quickest route is usually to ask your managing agent or freeholder whether a valid form already exists, and if not, to send them a fixed price so they can act.
How the EWS1 process works with Block18
- Free eligibility check. Send photographs and the number of storeys. We tell you whether a form should be needed and which survey applies.
- Fixed quote. The building owner or managing agent receives a fixed price and appointment letter.
- Desk review. We review any drawings, fire risk assessments and previous reports.
- Site survey. An outer survey for brick and block walls, using a borescope camera, or an intrusive survey for clad walls, with up to four small openings made good on the day.
- PAS 9980:2026 appraisal. We assess the walls and attachments and reach a risk outcome.
- Report and signed form. You receive the FRAEW report, the signed EWS1 form and a plain English summary, usually about ten working days after the visit.
How much does an EWS1 form cost?
Many firms only quote after a site visit. We publish fixed prices for blocks up to 18 metres, including travel, the survey, the PAS 9980 appraisal and the signed form.
| Survey | Up to 11 m | 11 to 18 m |
|---|---|---|
| Outer survey Brick and block walls, borescope, nothing removed | £2,450 | £2,950 |
| Intrusive survey Clad and rendered walls, up to four openings made good | £3,950 | £5,950 |
See exactly what is included at each price on our EWS1 and FRAEW cost page.
Start with a free check. We reply within one working day.
How long is an EWS1 form valid?
An EWS1 form is generally treated as valid for five years from the date it was signed. A new assessment may be needed sooner if the external walls or balconies are altered, if remediation works are carried out, or if new information comes to light about how the building was constructed.
EWS1 form or FRAEW: which do you need?
They do different jobs. The FRAEW is the full appraisal of the walls, used by the building owner and responsible person to understand and manage fire risk. The EWS1 form summarises the outcome for lenders and valuers. Government guidance notes that an EWS1 may draw on FRAEW evidence but does not replace an FRAEW. Because the form should be backed by a PAS 9980 report, we always provide both together from one visit.
EWS1 form questions
Is an EWS1 form a legal requirement?
No. There is no law requiring an EWS1 form for any building. Mortgage lenders and their valuers decide whether to ask for one, following the RICS professional standard.
Can I get an EWS1 form for my flat?
No. One EWS1 form covers the whole block, and it is commissioned by the building owner or managing agent. As a leaseholder you can ask them whether a valid form already exists, or send them a fixed price so they can commission one.
Is an EWS1 form the same as an EWS1 certificate?
People often call it a certificate, but it is a form, not a certificate. RICS is clear that it is for valuation and lending only and is not a fire safety certificate.
How long does it take to get an EWS1 form?
With Block18, the report and signed form usually follow about ten working days after the site visit. Visits are normally booked within days of the quote being accepted.
Does a building under 18 metres need an EWS1 form?
It depends on the building. Under the RICS standard in force from 1 November 2026, there are separate criteria for buildings of five or six storeys and for four storeys or fewer, based on visible cladding, curtain wall glazing and certain balconies. Many smaller blocks will not need one.
Who can sign an EWS1 form?
A suitably qualified professional. RICS says people who complete its Level 6 external wall training should be capable of completing Option A or B for buildings below 18 metres. Higher risk buildings are expected to be assessed by a chartered or incorporated fire engineer.