In short
- An FRAEW is a fire risk appraisal of external walls: a detailed assessment of how likely fire is to spread over or through a building's walls, cladding, insulation and balconies.
- It is carried out using PAS 9980:2026, the BSI code of practice revised in September 2026.
- It is usually triggered when a fire risk assessment raises concerns about the walls. It can apply to blocks of any height.
- Blocks with genuine brick or masonry walls are generally unlikely to need a detailed FRAEW, but the masonry has to be confirmed.
- The result is a risk outcome of low, tolerable, medium or high, with proportionate recommendations.
- Block18 carries out FRAEWs for blocks up to 18 metres at fixed prices from £2,450, with an EWS1 form included.
What is an FRAEW?
A fire risk appraisal of external walls, or FRAEW, is a structured assessment of the fire risk created by a building's external wall system. That includes the cladding, insulation, cavity barriers, balconies, windows and doors. It considers the risk to residents from fire spreading over the outside of the building, and helps the building owner or responsible person decide whether any action is needed.
An FRAEW only looks at the external walls. It does not replace the building's main fire risk assessment, which covers the common parts and the building as a whole. The two work together: the fire risk assessment identifies whether an FRAEW is needed, and the FRAEW's findings feed back into it.
When is an FRAEW needed?
Every block with two or more flats needs a fire risk assessment, and the Fire Safety Act 2021 makes clear that it must include the structure and external walls. An FRAEW is usually needed when that assessment raises concerns about the walls, for example:
- suspected combustible cladding or insulation
- wall construction that cannot be confirmed from drawings or records
- balconies or other attachments made from combustible materials
- past refurbishment or overcladding that changed the walls
Government guidance is clear that an FRAEW may be needed for blocks of flats of any height, not just tall ones. It also says buildings with traditional brick or masonry walls are generally unlikely to need a detailed FRAEW, because the risk of external fire spread is usually lower. The catch is that the construction must be confirmed as true masonry. A brick slip finish fixed over combustible insulation can look identical from the street.
PAS 9980:2026 now includes a method for establishing whether a building or its walls are inherently low risk, in which case a full appraisal is unnecessary. Our free check starts there.
PAS 9980:2026: the method behind every FRAEW
PAS 9980 is the code of practice published by BSI for appraising the external walls of existing blocks of flats. The second edition was published on 14 September 2026 and came into full effect on 30 September 2026. It clarifies and streamlines the method without materially changing its purpose.
The main changes from the 2022 edition include four bands of risk outcome instead of three, a method for screening out inherently low risk buildings, and separate risk tables for the fire performance and the facade configuration of balconies. The government has said it intends to make it a legal requirement for FRAEWs to follow the PAS 9980 framework when parliamentary time allows.
An FRAEW completed under the 2022 edition should remain valid until it needs review or updating. Read more in our PAS 9980:2026 guide.
What a good FRAEW report contains
In September 2026 the government published guidance on recognising quality in an FRAEW report. A good report should, among other things:
- set out its scope and limitations, separating facts from assumptions
- describe the building, its use, structure and refurbishment history in one place
- state the building height in metres and how it was measured
- describe each wall build up from outside to inside, including cavity barriers and fixings
- name the authors and reviewers and show their competence, declaring any conflicts of interest
- link evidence, including intrusive inspection findings, to its conclusions
- use labelled photographs and diagrams
- explain how the risk factors combine into the overall outcome
- say whether interim measures are needed and why
- give clear, proportionate recommendations and the expected risk once they are carried out
- finish with a plain language outcome for each wall type and the next steps
Every Block18 report is written to meet these points, and comes with a one page summary you can share with residents.
Outer or intrusive survey?
Documents often do not match what was built, so an on site inspection is expected. How far we need to look inside the wall depends on how it is built.
Outer survey: brick and block walls
For traditional cavity walls we inspect every elevation and balcony from outside, then pass a borescope camera through a small hole in a mortar joint or air brick to see the cavity insulation and confirm the wall is true masonry. Nothing is removed.
Intrusive survey: clad and rendered walls
Where there is cladding or an insulated render system, we also make up to four small openings to see the insulation, boards, membranes and cavity barriers behind it, and make them good the same day. Access equipment is included where openings are above ground floor.
FRAEW risk outcomes explained
| Outcome | What it usually means for the building owner |
|---|---|
| Low | No further action needed on the external walls beyond normal maintenance. |
| Tolerable | The risk is acceptable. There may be advice on management or maintenance, but no remediation. |
| Medium | Action is likely to be recommended to reduce the risk, proportionate to the findings. |
| High | Action is needed. Interim measures may be required while remediation is planned. |
The exact recommendations always depend on the building. Where an EWS1 form is also needed, the FRAEW outcome is what the rating on the form is based on.
How to commission an FRAEW
- Gather information. Drawings, fire strategies, building control certificates, previous fire risk assessments and FRAEWs, and any cladding or insulation warranties. Missing paperwork is common and does not stop an appraisal.
- Choose a competent assessor. Check qualifications, experience with similar buildings, professional indemnity insurance and knowledge of PAS 9980:2026. If you are applying to the Cladding Safety Scheme, the FRAEW must come from a firm on its panel.
- Agree the scope. Which walls and attachments are covered, whether intrusive inspection is included, what you will receive and when.
- Arrange access. The assessor may need communal areas, some flats and balconies. Let residents know in advance.
- Act on the findings. Follow the action plan. If the risk is high, act quickly. For buildings over 18 metres, the fire and rescue service should be notified.
Fixed price, intrusive inspection included where needed, EWS1 form included.
After the FRAEW: remediation and funding
If works are recommended, the report should explain what is needed, why, and how much it reduces the risk, so you can get contractor prices. Depending on the building, funding may be available. The Cladding Safety Scheme covers buildings of 11 metres and above outside London and 11 to 18 metres inside London, and the Developer Remediation Contract applies where a developer has signed up. Homes England's Tell Us tool helps if eligibility is unclear.
FRAEW questions
What does FRAEW stand for?
Fire risk appraisal of external walls. It is a detailed assessment of the risk of fire spreading over or through a building's external walls, cladding, insulation and balconies.
Is an FRAEW the same as a fire risk assessment?
No. A fire risk assessment covers the building as a whole and is required for every block with two or more flats. An FRAEW is a specialist appraisal of the external walls, usually recommended by the fire risk assessment.
Does every block of flats need an FRAEW?
No. It is needed when the fire risk assessment raises concerns about the walls. Buildings with traditional brick or masonry walls are generally unlikely to need one, once the masonry has been confirmed.
How long does an FRAEW take?
For a single block under 18 metres, usually one day on site and about ten working days for the report. Larger or more complex buildings take longer.
Do you need to open up the walls?
For clad and rendered walls, yes. We make up to four small openings and make them good the same day. For brick and block walls a borescope camera through a small hole is usually enough.
Is my FRAEW under PAS 9980:2022 still valid?
Generally yes. Government guidance says an FRAEW completed under the 2022 version should remain valid until it needs review or updating.